USE CASE · CAPTURE & WIN
Transfer Project Evidence Into Estimating and Capture Handoffs
Build each construction estimating handoff with the source trail intact. Separate verified owner facts from open assumptions and assign the next checks.
Talk to SalesExplore Project Intelligence
THE BUSINESS PROBLEM
Prepare an estimate-ready project evidence handoff
Estimators and capture leads need a current source trail, not a collection of loosely dated project notes. Every handoff should distinguish confirmed owner requirements from working assumptions that still need technical review.
Project development notes become misleading when design changes are omitted at handoff. Preserve the latest source date and explicitly separate project budgets from estimated contract value. The DBIA design-build best practices provides project-delivery context. A credible estimating handoff still needs the current owner's scope, assumptions and dated source evidence.
Questions that change the decision
Latest owner scope and source date
Open quantities, dates and contract assumptions
Estimator acceptance and assigned follow-up
PROJECT-TO-DECISION PATH
Transfer a verified record into a structured estimating brief
The transition succeeds when an estimator can trace each material assumption to a source or an assigned open question.
01
Verified owner and project
Assemble the latest public project description, board changes and procurement milestones in one dated evidence register.
02
Cost completeness
Ensure the receiving estimator has a valid reason to price the project and access to the required technical inputs.
03
Research open items
Show the estimator every unresolved scope or quantity assumption before transfer.
04
Review with the receiving lead
The estimator receives a dated evidence package with assumptions and missing inputs explicitly listed.
OUTCOME
Review with the receiving lead
WHAT TO EXAMINE
Project evidence an estimator can rely on during handoff
Transfer dated project scope, owner amendments, technical questions and explicit gaps to estimating before the pursuit advances.
Verified owner and project
Correct public-owner identity, project location, scope and referenced source document.
Timeline and procurement
Published design, funding and solicitation milestones with their dates.
Commercial context
Available prior project or bid comparisons relevant to cost-review discussions.
Technical unknowns
Specifications, quantities, site conditions or design assumptions not established by public documents.
Decision record
The reason the pursuit was qualified, who validated it and the immediate estimator action.
DECISION CRITERIA
Decide whether the evidence package is ready for estimating
A construction estimating handoff needs current scope, a decision to keep pursuing and visible open assumptions. The tests decide whether the receiving team has enough to proceed.
01
Source currency
Are the project dates and scope drawn from current public records?
02
Cost completeness
Which quantities and assumptions cannot be inferred from budget numbers?
03
Comparable work
Are historical bids sufficiently similar to be useful?
04
Responsibility
Who owns technical validation, bid strategy and stakeholder communication?
05
Capture decision
Does the team still want to pursue given risk, access and resource demand?
DECISION OUTPUT
Review with the receiving lead
CITYLITICS SUPPORT
Construction estimating handoff with documented project evidence
Capital Projects Dashboard and Intelligence Feeds help assemble documented project context; where available, Market Share Dashboard can add bounded historical comparisons.
What your team needs to do
Citylitics capability
How it helps
Capture planning evidence
Capital Projects Dashboard
Export selected project records with owner, budget, start year and sources.
Record updated movement
Intelligence Feeds
Include source-linked timeline, stakeholder and project changes.
Prepare cited research
REX AI (Research Explorer, where available)
Where enabled, export a question-led brief for the receiving capture team.
Review comparable projects
Market Share Dashboard
Examine historical project and bid patterns as context for human estimators.
SOURCE VERIFICATION
Make the construction estimating handoff useful to the next team
Prepare a dated source register, mark each scope revision and separate verified requirements from open technical questions. Name the reviewer responsible for resolving each missing input before pricing starts.
01
Freeze the current project source register
Collect the latest capital-plan entry, board revision and publicly available project documents in a dated handoff register.
02
Reconcile scope changes before transfer
Compare the latest board or project amendments with prior scope and budget notes; list differences that estimating must address.
03
Answer the deciding question
Ask the estimator which critical quantities, technical documents and terms remain missing. Record those as blockers, not as inferred defaults.
04
Name the next step and its owner
Have the estimator acknowledge which inputs were received and which remain unresolved.
The evidence boundary for infrastructure project pursuit transition from market development to pricing
This is a customer-controlled research and handoff process, not a native estimating integration or automatic bid estimate. Citylitics contributes available public project context; the estimating and capture teams own technical, pricing and bid decisions.
EXAMPLE WORKFLOW
A capture-to-estimating handoff supported by original records
The handoff should make open assumptions visible before they become an estimator’s unexamined inputs. Estimators receive traceable owner records and a clearly scoped set of questions.
Signal
A capture manager uses Citylitics to move a water-infrastructure opportunity into estimating with a consistent evidence trail. A capital program, subsequent owner amendment and technical study establish the current project context.
Evidence
The capture team bundles dated source links, confirmed scope, engineering questions and ownership for missing estimating inputs.
Interpretation
The estimator can identify verified facts and unresolved assumptions before developing quantities or prices.
Action
The handoff delivers a documented project packet with named responsibility for each open question.
OPERATING METHOD
Hand off a project without losing the source trail
Project evidence becomes useful to estimators when it is specific and traceable. The recipient of a handoff must know which facts are verified and which are still assumptions. An estimating team needs more than a project URL or a CRM note.
1
Identify the handoff moment
Define when market development or account leadership transfers a pursuit to estimating or capture.
2
Collect verified project records
Export relevant Capital Projects Dashboard and Intelligence Feeds details with source citations.
3
Research open items
Use linked source Q&A where Research Explorer is available; separate answered questions from assumptions.
4
Add historical commercial evidence
Check appropriate Market Share Dashboard bid/project records if available and comparable.
5
Review with the receiving lead
Have the receiving estimator or capture lead accept the open-question list and own the next verification step.
BUSINESS OUTCOME
A construction estimating handoff with assumptions clearly marked
The handoff should make open assumptions visible before they become an estimator’s unexamined inputs. The transfer package should carry dated source links, scope and owner facts, known procurement milestones, exclusions and a named person to resolve each gap.
01
One current source register
Capture and estimating use the same current owner and project record instead of conflicting internal descriptions.
02
Unresolved assumptions exposed
Unresolved design parameters, quantities and bidding conditions are listed explicitly.
03
Estimating acceptance documented
The receiving team decides whether the opportunity can be priced, needs more evidence or should wait for a formal package.
TARGET TEAMS
Estimating managers, capture teams and infrastructure vendors
AEC firms
AEC capture teams can use source evidence to brief proposal and technical leads on scope, owner decisions and unresolved requirements.
Equipment and infrastructure vendors
Vendors and contractors can separate confirmed project facts from estimating assumptions before committing pricing resources.
Manufacturer's representatives
Manufacturer representatives can transfer project context and application questions to principals while preserving account responsibility.
ONE CONNECTED PLATFORM
Preserve project facts across teams and decision stages
Treat the estimating handoff as a sourced evidence package. Preserve open engineering assumptions, scope boundaries and record dates so the estimator can verify them.
Look up timeline and procurement
The project record helps preserve documented scope, value and stage information across a transition between teams.
Validate responsibility
A clearly documented evidence trail lets estimators find the original owner documents instead of relying on a pasted opportunity summary.
Research source questions with REX AI
For supported project records, Research Explorer can help locate scope revisions or milestone language relevant to the handoff. The recipient verifies each material assumption.
BUYER QUESTIONS
Questions about estimating handoff
What belongs in a construction estimating handoff?
Current owner scope and document revisions, key procurement dates, source links, assumptions needing review and named owners for missing information. Bid Review AI can help locate cited specification answers.
Can the data be sent directly to every estimating system?
The documentation supports exports and selected CRM workflows. Availability of system-to-system handoff varies and should not be assumed.
Does Citylitics generate an estimate?
No. The estimator prepares costs and commercial assumptions using project specifications and company methods.
Carry verified project context into your next estimating handoff
Build a traceable opportunity-to-estimating handoff from one named project, with source links and unresolved technical questions.